DESIGN & BUILD
NEW BUILD
LIVE SITE
HIGH-CARE

Location

King's Lynn, Norfolk

Time scale

44 weeks

Size

5,180m²

Contract value

£5,500,000
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>165</b><br />
 - PDF
Download PDF »

« Back to case studies

Bespak Europe Ltd 2

<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>176</b><br />
 - Case study image 1
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>180</b><br />
 - Case study image 2
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>181</b><br />
 - Case study image 3
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>182</b><br />
 - Case study image 4
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>183</b><br />
 - Case study image 5
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>184</b><br />
 - Case study image 6

Construction of clean room and associated areas.

A global supplier of drug delivery devices for injectable and inhaled products, Bespak Europe Ltd (part of Consort Medical plc) has contributed to the design, development and industrialisation of some of the world's leading medical products.

Our approach

Working closed with our M+E contractor and architect, Chalcroft value engineered an alternative solution for the client, proposing a revised internal layout which provided an optimised workflow, more space, dedicated service voids and enhanced visual impact and aesthetics of the external building. This solution offered the client an initial capex saving and long-term cost efficiencies.

Challenges and solutions

The new building was situated on the client's working site and so Chalcroft ensured Bespak's operations remained unaffected. A residential area was adjacent to the new facility, and Chalcroft worked with Bespak to liaise with the local community in the planning stages and manage construction sensitively.

Collaboration was key throughout the project, culminating in the client installing their equipment in the building prior to completion, to ensure they were able to commence production at the earliest opportunity.

DESIGN & BUILD
NEW BUILD
LIVE SITE
HIGH-CARE

Location

King's Lynn, Norfolk

Time Scale

44 weeks

Size

5,180m²

Contract Value

£5,500,000


Notice: Undefined variable: Recordset2 in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285