DESIGN & BUILD
EXTENSION
LIVE SITE
HIGH-CARE
REFURBISHMENT
MODIFICATION

Location

King's Lynn, Norfolk

Time scale

22 weeks

Contract value

£850,000
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>165</b><br />
 - PDF
Download PDF »

« Back to case studies

Bespak Europe Ltd 1

<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>176</b><br />
 - Case study image 1

Modifications to clean room production facility and new loading area.

A leading global supplier of drug delivery devices for injectable and inhaled products, Bespak has contributed to the design, development and industrialisation of some of the world’s leading medical devices.

The project included the refurbishment of an existing production area to provide two dedicated clean rooms for the moulding and assembly of pharmaceutical and medical devices. Chalcroft's work also included the extension of the building to construct a new goods in/goods out, as well as new welfare facilities, including toilets, offices and a canteen.

Challenges and solutions:
The area being converted formed part of an existing building containing Bespak's principle high-care production area; this had to remain operational at all times. Innovative design solutions were also required in order to overcome the challenges presented by limited floor to ceiling space.

We worked closely with the client throughout the project. This collaboration enabled Bespak to start installing production equipment in the clean rooms prior to the project's completion, minimising interruption to normal operations and maintaining high-care standards throughout.

DESIGN & BUILD
EXTENSION
LIVE SITE
HIGH-CARE
REFURBISHMENT
MODIFICATION

Location

King's Lynn, Norfolk

Time Scale

22 weeks

Size

Contract Value

£850,000


Notice: Undefined variable: Recordset2 in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285

Warning: mysql_free_result() expects parameter 1 to be resource, null given in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285