EXTENSION
HIGH-CARE
TEMPERATURE CONTROLLED
CONVERSION

Location

Wigan, Greater Manchester

Time scale

26 weeks

Size

4,333m² total

Contract value

£4,200,000
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>165</b><br />
 - PDF
Download PDF »

« Back to case studies

Hazeldene Foods

<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>176</b><br />
 - Case study image 1
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>180</b><br />
 - Case study image 2

Conversion of an existing curtain factory to a high-care salad factory.

Chalcroft transformed a disused curtain factory into a 3,492m² high-care, chilled production facility for Hazeldene Foods. A new refrigeration system, M+E, drainage, stainless steel kerbs, full sprinkler system and loading docks were installed.

Other work included a two-storey extension to be used as a 300m² Energy Centre and installation of a 541m² mezzanine floor.

EXTENSION
HIGH-CARE
TEMPERATURE CONTROLLED
CONVERSION

Location

Wigan, Greater Manchester

Time Scale

26 weeks

Size

4,333m² total

Contract Value

£4,200,000


Notice: Undefined variable: Recordset2 in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285

Warning: mysql_free_result() expects parameter 1 to be resource, null given in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285