LIVE SITE
HIGH-CARE
TEMPERATURE CONTROLLED
CONVERSION

Location

Liverpool, Merseyside

Time scale

20 weeks

Size

3,000m² over 2 floors

Contract value

£1,600,000
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>165</b><br />
 - PDF
Download PDF »

« Back to case studies

DHL Supply Chain

<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>176</b><br />
 - Case study image 1

New clean room co-packing facility with adjoining amenities.

Chalcroft converted part of an existing warehouse into a white-walled, temperature controlled contract packing facility. The conversion included installation of a mezzanine floor.

LIVE SITE
HIGH-CARE
TEMPERATURE CONTROLLED
CONVERSION

Location

Liverpool, Merseyside

Time Scale

20 weeks

Size

3,000m² over 2 floors

Contract Value

£1,600,000


Notice: Undefined variable: Recordset2 in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285

Warning: mysql_free_result() expects parameter 1 to be resource, null given in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285