LIVE SITE
HIGH-CARE
CHILL STORE
TEMPERATURE CONTROLLED STORAGE
CONVERSION

Location

Soham, Cambridgeshire

Time scale

9 weeks

Size

745m²

Contract value

£556,000
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>165</b><br />
 - PDF
Download PDF »

« Back to case studies

CP Foods (UK) Limited

<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>176</b><br />
 - Case study image 1

Conversion of warehouse into new high-care production facility.

Chalcroft converted warehousing units into production facilities where food is prepared and packaged for sale to the retail and food service industry.

Work included a new drainage system, resin flooring and ceiling; construction of a mezzanine floor in a new packing area and installation of new refrigeration equipment.

LIVE SITE
HIGH-CARE
CHILL STORE
TEMPERATURE CONTROLLED STORAGE
CONVERSION

Location

Soham, Cambridgeshire

Time Scale

9 weeks

Size

745m²

Contract Value

£556,000


Notice: Undefined variable: Recordset2 in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285

Warning: mysql_free_result() expects parameter 1 to be resource, null given in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285