HIGH-CARE
FROZEN
CHILL STORE
COLD STORE
COLD STORAGE
CHILL AND COLD STORAGE
TEMPERATURE CONTROLLED
REFURBISHMENT
FIT OUT

Location

Trafford Park, Manchester

Time scale

20 weeks

Size

15,500m²

Contract value

£4,600,000
<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>165</b><br />
 - PDF
Download PDF »

« Back to case studies

Kuehne + Nagel Ltd

<br />
<b>Notice</b>:  Undefined index: title in <b>/var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php</b> on line <b>176</b><br />
 - Case study image 1

Fit out of existing warehouse to provide multi-temperature warehousing and offices.

Chalcroft worked with global logistics provider, Kuehne + Nagel, to fit-out an existing warehouse, providing a distribution centre for Whitbread. Chill and freezer white-walled high-care areas were constructed, crane steel work strengthened and new racking installed. New loading docks and pods were built, along with an external plant room, two-storey office and car park.

Chalcroft also installed a new data system and security facilities, refurbished offices and the canteen and carried out yard and drainage repairs.

HIGH-CARE
FROZEN
CHILL STORE
COLD STORE
COLD STORAGE
CHILL AND COLD STORAGE
TEMPERATURE CONTROLLED
REFURBISHMENT
FIT OUT

Location

Trafford Park, Manchester

Time Scale

20 weeks

Size

15,500m²

Contract Value

£4,600,000


Notice: Undefined variable: Recordset2 in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285

Warning: mysql_free_result() expects parameter 1 to be resource, null given in /var/www/vhosts/chalcroft.co.uk/httpdocs/case-studies/project.php on line 285